The components produced in the coil winding and core assembly
stage are then taken into core-coil assembly stage.
The core assembly is vertically placed with the foot plate
touching the ground. the top yoke of the core is removed. The limbs
of the core are tightly wrapped with cotton tape and then varnished.
Cylinder made out of insulating press board/ pressphan paper is
wrapped on all the three limbs.
Low Voltage Coil is placed on the insulated core limbs.
Insulating block of specified thickness and number are placed both
at the top and bottom of the L.V.Coil.
Cylinder made out of corrugated paper or plain cylinder with oil
ducts are provided over L.V.Coil.
H.V. Coils are placed over the cylinder.
Description Equipment Core Lifter AssemblyThe Core Lifter is a lifting tackle manufactured for lifting of an Airplane Engine. The Core lifter is used for lifting of two types of engines, namely Rolls Royce T1000 and TXWB. The entire structure is 4m long and 2m high. It has been proof load tested for a weight of upto 12.5 tons. The load testing was done in India as well as in Singapore and witnessed by a Government Certified Chartered Engineer. Jendamark Techcellency also manufactured the load test setup for the same.Critical ParametersWelding as per BS StandardsProof Load Testing India and SingaporeComplex Machining